Skip to content
ACE COMBAT 8 official key visual of a pilot and fighter on a carrier deck
Ace Combat 8 Guides

Ace Combat 8 Aircraft Tree

Quick Answer

The documented F-35C aircraft sequence costs 1,270,000 MRP before weapons and parts. Use the budget tool to subtract owned planes and add your confirmed extra costs; the full route total remains unknown until every connector is checked in game.

On this page

The documented F-35C aircraft sequence costs 1,270,000 MRP before connecting weapons and parts. Its 550,000-MRP destination price is only one step. Use the calculator below to subtract aircraft you already own, add extra costs you have checked in your game, and see what remains unaccounted for. The prices and sequence are reported in the G2A Campaign aircraft guide, which does not provide a complete connector-price map.

For a flexible first campaign, the F-35C route is a strong default: it starts from the free F/A-18C, passes through useful multirole aircraft, adds an Electronic aircraft, and ends at a 550,000-MRP multirole. The F-22A and Su-57 are equally valid destinations if air-to-air combat or personal preference matters more to you. These are route-planning recommendations, not guarantees that one aircraft will solve every mission.

Check the aircraft roster and roles before selecting a destination, then use the MRP budget and farming method to fund its connectors.

Evidence checked — October 10, 2026: Aircraft-role and separate Online-progression information were checked against official material. Prices and Campaign routes are attributed to the published guide below. No complete in-game tree capture or numbered build verification is recorded.

Calculate the known part of your route

Aircraft workbench

Campaign route budget

Prices below are reported first-copy Campaign aircraft prices. Required weapons and parts cost extra; check your current tree.

Reported aircraft sequence only. Weapon and part nodes between these aircraft have not been fully mapped or priced.

Known aircraft steps — tick only aircraft you already own
Known aircraft subtotal
1,270,000 MRP
Already owned aircraft deduction
−0 MRP
Remaining known aircraft cost
1,270,000 MRP
Your confirmed additional costs
Not entered
Cost accounted for so far
1,270,000 MRP

Full route total: unknown. Unpriced weapon / part connectors remain outside this dataset. Your additional amount is a personal estimate based on your screen, and does not verify a complete route.

Selections and amounts stay only on this page. This tool does not read or change your game save.

Evidence: official aircraft descriptions · reported Campaign prices and route · official Online progression FAQ. Measured speed, handling, and damage are not available for comparison.

Start with the destination and tick only the aircraft already purchased on your Campaign save. Copy the subtotal of still-unpurchased weapon and part connectors from your current tree into the extra-cost field. Add your current MRP balance if you want a shortfall against the costs entered so far. Recheck the extra-cost field when changing destination or Super Hornet variant, because the connecting nodes may change.

The tool keeps three amounts separate: the reported aircraft subtotal, the deduction for owned aircraft, and your additional on-screen costs. It never converts missing connectors into zero or presents a complete route total from partial information. A blank extra-cost field means unknown; typing 0 records your own confirmation that the additional amount is zero.

Worked example with an existing Super Hornet

For the reported F-35C sequence, owning the Mirage 2000-5 and your chosen Super Hornet removes 370,000 MRP from the 1,270,000-MRP aircraft subtotal. The remaining listed aircraft cost 900,000 MRP: EA-18G at 350,000 plus F-35C at 550,000. If you also own the Growler, that known-aircraft remainder drops to 550,000 MRP. Neither result includes unpurchased weapon or part connectors.

Do not tick both Super Hornets as required purchases: the documented sequence presents an E or F choice. Identical reported aircraft prices do not establish identical special weapons or connecting nodes. For F-22A and Su-57, this tool displays the documented destination price without inventing their intermediate chains. For X-40 it adds the chosen high-end prerequisite and keeps the Mission 30 gate visible.

How the campaign aircraft tree works

MRP is the campaign currency used to buy aircraft, special weapons, and upgrade parts. You earn it from completed campaign and Free Mission sorties. A plane visible on the tree is not necessarily available as a direct purchase: you must own the prerequisite nodes that connect your current position to it.

That distinction matters most with expensive aircraft. Saving the 550,000 MRP printed beside an F-22A, F-35C, or Su-57 is not enough if required aircraft, weapons, or parts remain unpurchased. Before spending, zoom out, select the aircraft you want, and follow every connection back toward a node you already own.

Your campaign purchases remain available in later campaign runs and Free Missions. Campaign progression is separate from ACE COMBAT ONLINE progression, so online aircraft growth does not fill the campaign tree. This makes focused spending more useful than trying to finish the whole tree immediately: the MRP-priced aircraft alone total 8,900,000 MRP, before connecting weapons and parts.

ACE COMBAT 8 Aircraft Tree interface showing connected aircraft, special-weapon, and upgrade-part nodes

The Aircraft Tree links aircraft purchases with required weapon and upgrade nodes.

Aircraft prices and unlock gates

The table below groups the reported Campaign first-copy aircraft prices from the G2A aircraft guide. These are aircraft-node prices, with free and mission-gated unlocks kept distinct. They do not establish an Online price, a second copy for a wingman, or a cumulative route cost.

Cost or gateAircraft
Free at the startF/A-18C Hornet
Free after Mission 14A-6E Intruder
25,000 MRPF-4E Phantom II; MiG-21bis Fishbed
90,000 MRPF-14D Super Tomcat; Su-25SM Frogfoot; EA-6B Prowler
130,000 MRPMirage 2000-5; F-2A; MiG-29A Fulcrum; MiG-31B Foxhound
180,000 MRPSu-33 Flanker-D; Su-47 Berkut; F-16C Fighting Falcon; A-10C Thunderbolt II
240,000 MRPF/A-18E Super Hornet; F/A-18F Super Hornet; Gripen E; F-15C Eagle; F-15J Eagle; Su-34 Fullback
350,000 MRPRafale M; Su-35S Flanker-E; Typhoon; F-15E Strike Eagle; EA-18G Growler
550,000 MRPF-22A Raptor; F-35C Lightning II; Su-57 Felon
750,000 MRP after Mission 30FA-36 Game; EA-36 Barricader
1,000,000 MRP after Mission 30, plus another prerequisiteX-40 Nightmare

Use this as a budget check, not as a shopping list. A 25,000-MRP aircraft is not cheap in practical terms if it pulls you onto a branch you do not intend to continue. Conversely, a weapon or handling part on your chosen route can be a better immediate purchase than a new airframe because it improves the aircraft you already use.

How to choose your first aircraft-tree route

Start with the mission problem you need to solve and the hangar you actually want. Inspect the briefing, note whether the target mix is primarily aerial, surface-based, or mixed, and check whether the sortie limits aircraft selection. Then choose a late-game destination whose branch gives you useful intermediate options.

A good plan has three layers:

  1. Destination: Pick one high-end aircraft you genuinely want.
  2. Route: Trace every required aircraft, weapon, and part back to your current nodes.
  3. Mission tools: Buy useful equipment on that route when it addresses a current mission, rather than opening unrelated branches.

Choose an aircraft, weapon, or part next

When several adjacent nodes are available, identify what is actually blocking you before spending:

  • Buy an aircraft when it is a required route connector, adds carrier compatibility you need, or gives you a role that your current hangar cannot cover comfortably.
  • Buy a special weapon when its supported target type addresses a real mission problem and the node remains on your intended route.
  • Buy an upgrade part when your existing aircraft already suits the objective and improving it is more useful than replacing it.
  • Wait and save when a purchase only opens a side branch that does not support your destination or an immediate mission need.

Weapons and parts are not wasted spending when they are mandatory connectors or improve an aircraft you expect to keep flying. The mistake is treating every side node as equally urgent. Compare the node’s function with the next mission and your planned destination, then buy the smallest useful step.

Avoid calculating only the prices of the aircraft. The connectors are mandatory, but the available information does not provide a complete price map for every connecting weapon and part. Check those values in your own tree before committing MRP. For the F-35C route below, for example, the listed aircraft cost 1,270,000 MRP after the free Hornet, but that is a floor rather than the final route budget.

Flexible route toward the F-35C

The supported aircraft path is F/A-18C Hornet → Mirage 2000-5 → either F/A-18E or F/A-18F Super Hornet → EA-18G Growler → F-35C Lightning II.

StepAircraft priceWhy it fits the route
F/A-18C HornetFreeStarting multirole; lets you delay spending while inspecting the tree
Mirage 2000-5130,000 MRPMultirole intermediate aircraft
F/A-18E or F/A-18F240,000 MRPCarrier choice; F-model has an official Multirole label, E-model role is not confirmed here
EA-18G Growler350,000 MRPElectronic option before the destination
F-35C Lightning II550,000 MRPHigh-end carrier-based multirole destination

Those aircraft purchases total 1,270,000 MRP after the free Hornet. Your actual cost will be higher because connecting weapons and parts must also be purchased. The route is useful because it preserves mixed-target flexibility and includes carrier-capable aircraft, but it is not automatically best for every playstyle.

Fighter routes toward the F-22A or Su-57

Both the F-22A and Su-57 cost 550,000 MRP and are Fighter destinations. Choose one when your priority is air-to-air work or when that aircraft is the hangar goal you care about most. Select it in the tree and verify its current prerequisite line on-screen; do not substitute the F-35C route above, because the current information does not establish identical connectors for all three aircraft.

There is a useful post-campaign reason to choose any of these three high-end jets. Owning the F-22A, F-35C, or Su-57 satisfies the aircraft prerequisite for the X-40 Nightmare after the campaign gate is cleared. That does not make one of them mandatory during the story; it simply lets a first-campaign destination contribute to a later unlock.

Plan around carrier restrictions

Some first-campaign missions restrict you to carrier-capable aircraft. The aircraft tree marks carrier compatibility, so check that icon before buying a land-based plane you expect to use immediately. The F/A-18E, F/A-18F, F-35C, Rafale M, and Su-33 are described in the current information as carrier aircraft, while the route advice also emphasizes the value of naval branches during the opening campaign run.

The practical rule is to keep at least one capable carrier aircraft current with useful weapons and parts. Do not assume a newly purchased aircraft will be selectable in the next mission. Recheck the briefing and sortie screen first, and make sure an expensive land-based purchase will not leave your immediate carrier loadout neglected.

Community work-in-progress Ace Combat 8 aircraft-tree diagram with carrier compatibility markers

Anchor icons identify carrier-capable aircraft in the tree.

Use roles as guidance, not a power ranking

The tree assigns four roles. They describe a plane’s intended strength, but price and position do not guarantee that it will outperform every earlier aircraft in every mission.

RoleBest planning use
FighterAir-to-air interception and dogfighting
AttackerGround targets, ships, and surface-heavy sorties
MultiroleMissions that mix air and surface targets or may change focus
ElectronicJamming and support rather than maximum direct damage

The free F/A-18C is a useful reason not to rush: as a multirole, it can cover mixed objectives while you study the tree. You also receive the A-6E Intruder after clearing Mission 14, so a dedicated Attacker does not always need to be an early purchase. Buying an A-10C, Su-25SM, or another Attacker can still be sensible when you want that aircraft or need its mission tools; it simply is not an automatic requirement.

Electronic aircraft deserve separate consideration. The EA-6B Prowler is the lower-cost entry at 90,000 MRP, while the EA-18G Growler costs 350,000 MRP and appears on the supported F-35C path. Their value comes from a specialized support role, so judge them by how they fit your squadron and route rather than comparing only direct attack performance.

Post-campaign and bonus aircraft boundaries

Clearing Mission 30, “Song of Wings,” opens the FA-36 Game, EA-36 Barricader, and X-40 Nightmare as campaign-tree purchases. The FA-36 and EA-36 each cost 750,000 MRP. The X-40 costs 1,000,000 MRP and additionally requires ownership of the F-22A, F-35C, or Su-57.

Do not hoard every point through the story solely for these three aircraft. They are post-campaign purchases, so spend enough on a coherent route to keep the campaign manageable. After completion, Free Mission and later campaign runs let you earn more MRP and fill branches you skipped. Which replay is most efficient belongs to a dedicated MRP plan; for the aircraft tree, the important point is that progression continues after the first clear.

The F-14A and ADFX-02 Morgan -PIXY- sit outside normal MRP-tree progression. The F-14A was a preorder bonus. The Morgan is tied to the Season 1 Premium Ace Pass, and campaign use is gated until all campaign missions are complete. Neither should be counted as a normal shortcut through your first-campaign tree.

When the budget looks sufficient but the aircraft stays locked

Check the blocking condition in this order:

What you seeWhat to verify before spending
Enough MRP for the final aircraft, but purchase unavailableTrace the connecting line to the nearest owned node; an aircraft, weapon, or part may still be missing.
Calculator shortfall is zero, but you cannot complete the routeThe shortfall covers only accounted costs. Inspect omitted connectors and add their confirmed prices.
A-6E appears free but unavailableCheck the Mission 14 clear gate on this Campaign save.
FA-36, EA-36, or X-40 is still lockedCheck the Mission 30 gate; X-40 also requires a qualifying high-end aircraft.
Your preferred jet is missing from the sortie selectorCheck mission restrictions and its carrier anchor icon; ownership alone does not establish sortie eligibility.
You own the aircraft in OnlineInspect the separate Campaign tree. Online acquisition does not replace Campaign purchases.

This is a diagnostic sequence, not a claim that these are the only possible causes. If your current screen differs from the published table, use the visible in-game requirement and keep the difference in your budget.

A practical spending checklist

Before confirming any node, run through this short check:

  • Confirm the destination. Know which aircraft the purchase is moving you toward.
  • Count connecting nodes. Include required weapons and parts, not only aircraft prices.
  • Check the next briefing. Verify target mix and carrier restrictions before buying for an immediate mission.
  • Keep one dependable loadout. A useful aircraft with relevant parts and special weapons can be worth more than several unprepared airframes.
  • Delay side branches. Return through Free Mission or another campaign run rather than weakening your main route.
  • Separate campaign and online progress. MRP-tree purchases do not transfer from ACE COMBAT ONLINE.
  • Treat recommendations as options. The F-35C route emphasizes flexibility; the F-22A and Su-57 routes serve different preferences. None guarantees a rank, clear, or ideal result.

If a route becomes uncomfortable, stop widening the tree and inspect the nearest useful nodes on the branch you already funded. The campaign gives you a flexible starting multirole and later a free Attacker, so recovery does not require buying every role at once. A clear destination, verified connectors, and one mission-ready aircraft are enough to keep progressing without wasting MRP.

  • G2A aircraft guide: reported Campaign first-copy prices, the F-35C aircraft sequence, and mission-clear gates. The calculator's arithmetic follows those prices; complete weapon and part connectors are not provided.
  • Official aircraft descriptions: role and qualitative mission-profile evidence, rather than route costs.
  • Official multiplayer FAQ: separate Online acquisition and progression.

Compare the aircraft roster before committing to a destination, choose a plane for your mission goal, and use the MRP earning guide when the remaining purchase genuinely requires more funds.